Vulcan offshore hammers have successfully driven piles offshore for about half a century. This sequence of photographs shows a typical use of the Vulcan offshore hammer.

The key to successful hammer operation is proper preparation on deck. Here the cushion is packed, the parts are checked and the hammer is securely connected to the crane via the hinged lifting bale.

The hammer is lifted slowly off of the deck. As is the case with any heavy lift operation, safety is first and enough time is taken to insure a successful lift.

The hammer is almost vertical. The stabbing bell at the bottom of the hammer has a ring at the bottom to enable the crane operator to stand the hammer and leaders up vertically before lifting the assembly off of the deck.

The crane operator then positions the hammer over the pile and, lowers it and seats the pipe cap firmly on the pile. The tapered stabbing bell facilitates alignment between hammer and pile, even on a batter.

A Vulcan hammer driving yet another pile on the way for a successful platform installation.

Click here for more information and photos about Vulcan offshore hammers and conventional platforms.

Shared Bottom Border

a subsidiary of Pile Hammer Equipment Corporation
Click here to visit

Vulcan Foundation Equipment
1297 Scenic Highway
Rising Fawn, GA 30738
Phone (706) 398-1178
Fax (706) 398-1178
Copyright © 2001-2010 Vulcan Foundation Equipment. All rights reserved.
This site maintained by Positive Infinity