Woodrow Wilson Bridge Replacement
"A Firm Foundation for the Capital Beltway"

The replacement of the Woodrow Wilson Bridge is one of the largest construction projects undertaken in the eastern United States. For the foundation work, the centerpiece of the job was the installation of the 48"-72" O.D. pipe piles. Most of this work was done by an IHC S-500 Hydrohammer.

The work was described in the article "A Firm Foundation for the Capital Beltway," detailed in the November 2002 issue of Pile Buck. This article is available from this website by clicking the link below (pdf format.)

You can also get a "quick overview" of this job by viewing the slide show below.

Previous Slide

Next Slide

Use the buttons above to go forward or backward.

Free DHTML scripts provided by
Dynamic Drive

Shared Bottom Border

member of the IHC Caland Group
Click here to visit

Vulcan Foundation Equipment
111 Berry Road
P.O. Box 16099
Houston, TX 77222
Phone (713) 695 4000
Fax (713) 691 0089
toll free (800) 742-6637
Copyright © 2001-2008 Vulcan Foundation Equipment. All rights reserved.
This site maintained by Positive Infinity